Updates
Check out the latest news and keep up with progress
PROJECT UPDATE
Project Update: JPT2 is done. Just need to proof it this weekend, then I'll drop the PDF.
Hey all,
Just like the subject says, JPT2 is done. It's still a little "raw", so I'll have to wait until my brain stops sizzling to put some fresh eyes on it. Tomorrow and Saturday I've blocked out time for that, so you should see the PDF Sunday or Monday.
I'll give it a week to marinate and check any last minute mistakes. Then it's off to the domestic printers.
Thanks again for your patience! It's been a pretty rocky 12 months, but we're getting back in the saddle.
If you have an address change, be sure to drop me a note at [email protected] and I'll get that set up for you.
Talk to you all soon!
- Dave
Just like the subject says, JPT2 is done. It's still a little "raw", so I'll have to wait until my brain stops sizzling to put some fresh eyes on it. Tomorrow and Saturday I've blocked out time for that, so you should see the PDF Sunday or Monday.
I'll give it a week to marinate and check any last minute mistakes. Then it's off to the domestic printers.
Thanks again for your patience! It's been a pretty rocky 12 months, but we're getting back in the saddle.
If you have an address change, be sure to drop me a note at [email protected] and I'll get that set up for you.
Talk to you all soon!
- Dave
PROJECT UPDATE
Project Update: Progress Report 9/18/26
Hey all,
Just a quick checkin. Most of JPT2 is done, at least the pure content. Working on images, maps, and the adventures now, along with a few tables. I'm still hoping to drop PDFs for you all by next week and get these books printed shortly after that.
Books 3-5 are paperback with so-so pages. I decided I want to upgrade those. I don't *think* the printer will make me go through the whole process again (it's just a couple button clicks). Either way, I can do that whilst doing proofs for JPTs 1 and 2, so as not to slow things down.
Tomb of 10,000 Traps will be working on while those are printing. In a perfect world, I'll be able to get them all done at the same time. I'll keep you posted either way.
Thanks!
- Dave
Just a quick checkin. Most of JPT2 is done, at least the pure content. Working on images, maps, and the adventures now, along with a few tables. I'm still hoping to drop PDFs for you all by next week and get these books printed shortly after that.
Books 3-5 are paperback with so-so pages. I decided I want to upgrade those. I don't *think* the printer will make me go through the whole process again (it's just a couple button clicks). Either way, I can do that whilst doing proofs for JPTs 1 and 2, so as not to slow things down.
Tomb of 10,000 Traps will be working on while those are printing. In a perfect world, I'll be able to get them all done at the same time. I'll keep you posted either way.
Thanks!
- Dave
PROJECT UPDATE
Project Update: Progress Report
Hey friends,
I was hoping that the seven day sprint this week would get things ready, but I'm probably still about a week out from releasing PDF 2. There's some pretty cool stuff going into this. If you're a patron, you've probably seem some of my notes on villages/towns, etc. on my quips page.
Anyways, shouldn't be too much longer.
I'll be going ahead and making sure that everything else from this campaign is up and ready to ship even before book 2 is done.
If you have an address change, make sure to message me at [email protected] with the subject line "Just Passing Through Remastered" and I'll get that squared away for you.
Have a good weekend and cheers!
- Dave
I was hoping that the seven day sprint this week would get things ready, but I'm probably still about a week out from releasing PDF 2. There's some pretty cool stuff going into this. If you're a patron, you've probably seem some of my notes on villages/towns, etc. on my quips page.
Anyways, shouldn't be too much longer.
I'll be going ahead and making sure that everything else from this campaign is up and ready to ship even before book 2 is done.
If you have an address change, make sure to message me at [email protected] with the subject line "Just Passing Through Remastered" and I'll get that squared away for you.
Have a good weekend and cheers!
- Dave
PROJECT UPDATE
Project Update: PDF 2 Pre-Proof out in 7 days.
Hey all,
I'll be sprinting this week on PDF 2 to get it wrapped up and out in at least a pre-proof format.
It's a lot, but I've done crazier things before. It also helps that a lot of it is already written.
Once that's done, I'll proof read, get proofs, print, and ship.
If you have an address change, please let me know at [email protected]
Please let put into the subject that it's an address changes for Just Passing Through Remastered.
- Dave
I'll be sprinting this week on PDF 2 to get it wrapped up and out in at least a pre-proof format.
It's a lot, but I've done crazier things before. It also helps that a lot of it is already written.
Once that's done, I'll proof read, get proofs, print, and ship.
If you have an address change, please let me know at [email protected]
Please let put into the subject that it's an address changes for Just Passing Through Remastered.
- Dave
PROJECT UPDATE
Project Update: Updated Shipping Timeline
Hey everyone,
Just letting you know I'm pushing up one more month for this. I'm wrapping up another book, doing shipping on a couple projects, then I'll have these books wrapped up and shipped, too.
We've changed the email for address changes. You can send requests to [email protected]
Sorry for the mix-up on the previous address.
And as always, thanks for your patience!
- Dave
Just letting you know I'm pushing up one more month for this. I'm wrapping up another book, doing shipping on a couple projects, then I'll have these books wrapped up and shipped, too.
We've changed the email for address changes. You can send requests to [email protected]
Sorry for the mix-up on the previous address.
And as always, thanks for your patience!
- Dave
Community Leaders
Become an active participant Learn more