Project Update: Twisting Unseen Update August 2026
Hello folks,
At this point, the project is behind schedule. I may be able to catch up, thanks to the big amount of buffer time I built into the timeline, but I'll be frank: I have a new life to accommodate to with my family and by now I need to accept that adapting to life in the tropics is not going to be as simple as I'd thought.
Manuscript status
The answer to this bit is: Get over yourself, Chris.
Jokes aside, the lack of scheduling the dedicated time to work consistently is the main problem. I'm very much a creature of habits, and not having a real routine has been difficult to manage. Once the kiddo is back at school, I feel like landing on the finalized, layout-ready draft will be much easier.
In any case, thanks for your understanding and continued support, folks.
Project Timeline
- September 2026: Finish style guide revisions, slap into layout.
- October 2026: Print tests, and finalize Layout with Jean.
- November 2026: Production (patches, map, flyers, zine), and shipping to warehouse
- December 2026: Kitting
- January 2027: Fulfillment Begins
Future Updates
Signing off,
15+ projects backed in 2024
15+ projects backed in 2025
Project Update: Mini-Update, Twisting Unseen
Hiya folks,
All best,
15+ projects backed in 2024
15+ projects backed in 2025
Project Update: Twisting Unseen Update June 2026
Hi folks,
I did mention in the last update that I would have more availability in July, and with Flatline off to print, that's looking to be the case. (For the most part, I still have to pack boxes.) I am hoping to have some layout to show off in time for the next update.
Project Timeline
- July 2026: Finish style guide revisions/begin Layout
- August 2026: Finalize Layout with Jean + Order print tests
- September 2026: Proofreading + Print test checks
- October 2026: Production (patches, map, flyers, zine)
- November 2026: Shipping to Warehouse
- December 2026: Kitting
- January 2027: Fulfillment Begins
Future Updates
Signing off,
15+ projects backed in 2024
15+ projects backed in 2025
Project Update: Twisting Unseen Update May 2026
Hi folks,
Not fun news, I know, but like I mentioned last month, the work is cut out for me once I have the actual time to get into layout for Twisting Unseen. And July will be kiddo-free (actual papa tears), so I'll be able to work full time on ttrpgs between boxes that month.
Project Timeline
July 2026: Finalize Layout with Jean + Order print tests
August 2026: Proofreading + Print test checks
September 2026: Production (patches, map, flyers, zine)
October 2026: Shipping to Warehouse
November 2026: Kitting
December 2026: No-go postal delivery zone, :(
January 2027: Fulfillment Begins
Future Updates
Signing off,
15+ projects backed in 2024
15+ projects backed in 2025
Project Update: Twisting Unseen Update April 2026, layout & timeline
Hello folks,
We spent a good amount of time correcting some of my amateur layout settings, and talked about how to prep the manuscript for import. Not only that, Jean had some true layout wizardry (for the professionals: Decorations) that kinda broke my brain, but I was able to put into practice emulating some design work Jean had already done for the zine mockups.
All that was just before the spring break hit. When I posted last month's update, I'd totally forgotten I had to be on vacation this month. Ouch. Plus, my family is preparing for an unexpected transatlantic move this summer! Well, the big move was a possibility, but in our minds it was definitely a long shot. This has naturally put the time crunch on something fierce!
The style guide edits to Twisting Unseen that I mentioned in the last update are running behind schedule, due to other professional engagements taking priority during this crunch. (Check out my 5 Million Worlds Rokaner Reports, i.e. my newsletter, to follow more on that work.)
I'm not too worried about delivering this project on time, however. With the new tools that Jean has taught me, this is likely to be the quickest layout I've done yet. The overseas move does put me in a pickle for getting my hands on print tests, so I've opted to release an updated Project Timeline.
Project Timeline
June 2026: Begin Layout
July 2026: Finalize Layout with Jean + Order print tests
August 2026: Proofreading + Print test checks
September 2026: Production (patches, map, flyers, zine)
October 2026: Shipping to Warehouse
November 2026: Kitting
December 2026: No-go postal delivery zone, :(
January 2027: Fulfillment Begins
I built in a lot of redundancy for this project just in case the overseas move became a reality. This updated version of the Project Timeline slots all the production together, and runs coinciding proofing with print checks (which was how I did Not Enough Scoundrels). I'll continue posting updated Project Timelines as the months continue, :)
Future Updates