Embark on fast paced heists with all-or-nothing stakes through the Scottish underbrush! Perfect for fans of Fantastic Mr Fox, Redwall and Oceans 11. Now featuring three new bonus adventures!
One player acts as the Scurry Master, while the other players act as crafty Beasts participating in a fast paced heist, called a Scurry.
Throughout their adventure, the Beasts will be faced with obstacles to overcome. The group’s stamina is represented by the Scurry Dice, which start as D12s. All Beasts share the Scurry Dice between them.
Whenever the Beasts need to push their luck, the Scurry Master will call for them to roll the Scurry Dice, which determines what happens next in the heist:
Max - Critical Success : The beasts do better than expected, and regain some stamina.
4+ - Success : They do as well as they can, and avoid danger.
2 to 3 - Complication : The beasts pull through, but not quite as intended.
1 - Hijinx : Something goes hilariously wrong, and chaos is sure to follow.
The Scurry Master marks Progress on a clock whenever Something Bad happens during the heist - like if the Beasts hesitate for too long, someone is caught, or the heist’s success is jeopardised.
Whenever the clock fills, the Scurry Dice go down in size, from D12 to D10, to D8… it gets harder and harder to roll 4 or more, which means more bad things happen, and the clock fills up faster. Every Scurry turns into a hectic dash for the finish line!
If the Stress Dice should ever drop from D4 down to D0, Something Awful happens and the heist fails. Everyone then joins in together, narrating just how terribly everything falls apart. The worse it gets, the more fun for everyone.
If the Beasts pull off their Scurry, the size of the Scurry Dice determines their ending.The bigger your dice, the better your epilogue!
Character creation is efficient and creative in Scurry. Pick four Tags straight off the page (or invent your own) to describe who you’ll be playing as. You'll need:
A Skill, taught to you by your guild.
A Tool, brought along to help in the coming heist.
A Talent, that you love to show off.
A Trait, something special your animal body can do.
During the heist, you can roll the Scurry Dice twice and take the higher result if you can convince the Scurry Master that one of your tags is relevant to the current situation.
This new edition of Scurry features 3 stand-alone adventures to go on across Spring, Summer and Autumn:
Best in Show. The star of this year’s pet pageant show has gone missing, and her owner thinks she’s been bug-napped! Can you investigate the other competitors and track down this fluttering beauty before curtain call?
Making Your Mark. The artists of Pinelight need rare Titan reagents to finish their heroic mural. Which will you quest for: Half-seen Paint, the Sun-Drinking Stars or the Light-Throwing Crystals? And what fate has befallen the animals of Team B, and can you rescue them in time?
Fangs, Steel and Stolen Honour. After losing a treasured heirloom, the wolf-sovereign has challenged the bear-king to a deadly duel, with a city full of innocent beasts caught in the middle! Can you sneak through a beaver dam, find what’s been lost, and bring peace before these behemoths wreak havoc in the city?
Each heist comes with delightful new artwork from Yasmin Younane (PrintWeaver, Tome of Pacts), Letty Wilson (Hollows, KNOCK!, A Folklore Bestiary) and VER(Wolvendaughter, Sacred Bodies).
These new heists pack in alongside the original three-part campaign following the misguided quest of Cinéad the Knower, and the bonus setting guide and heroic adventure for the Toads of the Bristley Woods from the second edition.
This new edition is ready to send to print! After a successful campaign, I hope to send Scurry to print and collect addresses in April 2025, and begin fulfilment in May 2025.
I’m based in the UK, and will ship all orders using Royal Mail services. USA orders will be fulfilled through my distribution partner Indie Press Revolution. I will confirm all shipping times when the books are printed.
Estimated shipping fees for an untracked Deluxe Hardcover are as follows:
UK & Northern Ireland. £4.
Europe. £6 (plus pre-charged EU VAT, dependant on delivery country)
USA. £8. (fulfilled within the USA by IPR)
Rest of the World. £9-12.
Tracking. This is a one-man-run campaign. I'll try my best to offer the option for tracked delivery, but the default will be untracked. More information is available in the FAQ.
Brian Tyrrell is a multi-award winning games publisher, writer, and graphic designer. I founded Stout Stoat Press, and co-organises two conventions (TAGS and ECAF) in Edinburgh, Scotland, where I also live. I wrote the Beast Fables setting, as well as Scurry, and I'm running this project!
Editor
Roz Leahy is an award-winning and prolific editor, game designer and workshop facilitator. She’s worked with Melsonian Arts Council (Troika), Cubicle 7 (Warhammer 40,000: Wrath and Glory, Vault 5e), Tuesday Knight Games (Mothership) and a number of independent roleplaying and boardgame publishers.
Writers
Elliot Davis, aka "moreblueberries", is a Brooklyn-based game designer, podcaster, and artist known for such releases as Project ECCO, Rom Com Drama Bomb, and the upcoming The Time We Have.
Steph is one half of Fistful of Crits and wears the hats of writer, illustrator and graphic designer in turn. She enjoys making highly striking, immersive games across a variety of genres that interest her.
Yubi Coates is a Scottish disability advocate, accessibility consultant and trained textile conservationist. Their previous work includes as an accessibility consultant within the TTRPG industry, and as a freelance writer for Hit Point Press.
Illustrators
VER is a writer and illustrator from Eastern Europe, residing in Scotland. They spend most of their time writing and drawing stories about strange people and distant worlds. Their recent works include Eisner-nominated Wolvendaughterand Sacred Bodies.
Letty Wilson is a a comics artist, writer and illustrator originally from the Highlands of Scotland, now living in Glasgow. Their work is interested in depicting the monstrous and the biological, and how we use cycles of nature and animal imagery to talk about ourselves. You can see more of their work in Hollows, KNOCK!andA Folklore Bestiary.
Yasmin Younane is a British/Iraqi illustrator and ceramicist based in London, UK. Their work usually takes the form of goofy little ceramic creatures, custom tattoo designs and creature illustrations for TTRPG projects, such as The End of Amarna.
As with previous editions, the PDFs for the newest edition of Scurry will have accessibility tags and alt text and a robust set of bookmarks throughout, so that it can be read with Screen Readers. These will be implemented at launch!
We use essential cookies and our own first-party analytics to run BackerKit. With your consent, we also use cookies to measure our marketing and share data with advertising partners to show you relevant ads. Accept to allow all cookies, or reject to turn off the optional ones.
Read our cookie policy.